Rebuild Caterpillar Equipment to Like-New Condition and Performance

Caterpillar has a nearly 100years history of sustainable innovation that continues to help customers build a better and more sustainable world by providing innovative products and solutions

Caterpillar rebuild machine 100% under strict Caterpillar standards for workshop and personnel management and maintenance to ensure the quality of rebuild, maintenance personnel are trained and certified by Caterpillar, maintenance process of strict pollution control, 100% use original Caterpillar spare parts, every link is strictly controlled to ensure the quality of the equipment, maintenance records and reports will be provide to customers after rebuild completed

The rebuild is divided into the whole machine rebuild and parts rebuild

The complete machine rebuild may carry on the comprehensive repair and the upgrade for your old excavator and old engine.

The componment rebuild is mainly maintenance or replacement hydraulic valves, main valves, crankshaft, cylinder head, bearings and seals of the engine

Caterpillar has developed a variety of rebuild programs for customers to adapt to different rebuild needs

https://www.cnfengtop.com/

The process of rebuild

Pre-inspection, rough cleaning, professional disassembly, fine cleaning, parts inspection assembly, testing, painting process, delivery.

Step 1: Inspection
All part will be divided into 3 level after Caterpillar’s professional inspection

Level one non-reusable parts such as seals, gaskets, bearings etc are must use original Caterpillar spare parts

The second and third-level parts that are not necessarily replaced are precisely detected will be according to wear detection whether the replacement of parts such as piston, cylinder, arm rocker, valves, seats.

Third level parts cylinder head, cylinder block, crankshaft, etc that generally do not necessari to replacement.

Step 2: Make a maintenance program

Customized professional, reasonable maintenance program

Step 3:  Assembly

Through the engineer high-precision boring, grinding, welding process, to complete the repair and assembly for the equipment.
Step 4: Test,  how much has the equipment improved after rebuild?

After replace the old part to Caterpillar original spare part to maintenance, the engineer will test the equipment or engine,the engine should be tested at the power test bench for 15-20 hours load test, reach at 95% output power as satisfactory.

The hydraulic pump needs to be tested on a flow test bench,and compared to the initial data.

 

Step 5:  Painting

After the whole machine is refurbished, it will be treated with sheet metal and painting,

to restore its fashion handsome”Good-looking”!

Step 6 delivery:
After completion of all maintenance procedures the new machine delivered to the user

Any changes to the equipment after the rebuild?

By refurbishing the equipment, it can be restored to a level close to that of a new machine, improve the efficiency of the scale, reduce downtime, and extend the service life of the equipment.

https://www.cnfengtop.com/

Conclusion:

Many people are often worried about detecting issues, believing that if the equipment can still working, then there’s no problem. However, in terms of equipment inspection, we should do regular checks and not overlook them just because no issues appear to be present. Identifying problems early allows us to solve them sooner. Sometimes, equipment issues are not obvious and require professional tools to detect. We recommend that customers use Caterpillar’s specialized tools to check their equipment’s health. This enables them to perform scheduled or preventive maintenance, effectively preventing serious malfunctions and reducing repair and operational costs.